geotechnical and geoenvironmental
engineering practice

  • Home
  • Services
    • Waste (Materials Management Plans)
    • Ground Investigation
    • Geotechnical Design
    • Contamination Investigation and Assessment
    • Contaminated Land Remediation
    • Laboratory Testing
  • About us
  • Projects
    • Housing
    • Leisure
    • Industrial and Commercial
    • Education
    • Materials Management Plans and Waste
    • Geotechnical Consultancy
    • Environmental Consultancy - Regulatory Agencies
    • Environmental Consultancy – Private Individuals
    • Infrastructure
  • Links
  • Testimonials
  • Contact us
    • Enquiries
  • Policies
You are here: 
Home > Projects > Infrastructure

 

 

 

Infrastructure

 

Littlehampton Harbour, West Sussex

Investigations have included the drilling of boreholes, the installation of monitoring standpipes and production of interpretative reports for the design of sheet pile walls and revetments.

 

 

Gosport Marina, Hampshire

As a part of the marina development in Gosport we inspected the existing quay wall to identify tie rod locations. Investigation works also included drilling boreholes and carrying out a programme of laboratory testing to assist in the design of reclamation works and the development of the waterfront for new apartments.

  

Pevensey, East Sussex

Works were proposed to improve flow measurement on existing water courses throughout the Pevensey Levels, a site of special scientific interest, in East Sussex. We designed investigations to ensure minimal impacts (using window sampler and hand augering techniques), which enabled the soil profile to be modelled and allowed the installation of new measuring weirs and groundwater monitoring standpipes.

 

 

Brighton & Hove Bypass

The earthworks contract for the construction of the Hangleton Phase of the A27 bypass involved forming cuttings and embankments through the Chalk of the South Downs. As a part of this project we were commissioned by the earthworks contractor to carry out in situ density tests, saturated moisture content tests, dynamic probing and cable percussion drilling as part of the compliance testing programme required by the specification.

 

Involvement in other phases of the bypass included undertaking in situ plate bearing tests for the design of temporary works supporting the Falmer over bridge, and undertaking a contamination assessment of a diesel spillage during site clearance works on the Southwick tunnel.

 

 

Railtrack Overbridge, Sydenham, Kent

We carried out investigations to assess the cause of cracks noted in the walls of the abutment to an existing overbridge. Hand dug trial pits excavated adjacent to the tracks revealed foundations to the abutment and diamond coring was used to establish the thickness of the brickwork forming the walls. Cable percussion boreholes were excavated from road level to establish the materials used to construct the embankment and to obtain information on the underlying soils for the design of new foundations. Reports were produced advising on the cause of the damage and on the alternatives available for foundation repairs.

 

 

More Projects

 

Copyright Ashdown Site Investigation Limited
Contact Tel: 01273 483 119
Ashdown Site Investigation Ltd on LinkedIn
Website by BadgerBytes Ltd

ace          UKAS         AGS        

Web Edit Login
To edit the content of your website please login using the fields below:
Email:
Password: