Retaining Wall Failure, Hastings, East Sussex
Ashdown Site Investigation was asked to inspect the site of a retaining
wall that had collapsed across a highway, exposing the footings
of a three-storey townhouse above. An investigation was designed
to provide information for the modelling of the soil and bedrock
profile. The latter information, together with the results of tests
made to determine the geotechnical properties of the soils, was
analysed to provide advice for the design of emergency underpinning
works for the house and the safe reconstruction of the retaining
wall.
House Subsidence, Brighton, East Sussex
A number of houses supported on shallow footings bearing on valley
bottom deposits had been subject to significant long-term settlement
resulting in structural cracking.
Ashdown staff have been involved with the investigation of a number
of these properties. Investigation works have included crack monitoring,
the excavation of boreholes and trial pits to establish ground conditions
and the nature of the existing foundations, and drain surveys, to
establish route and condition. Our engineers have undertaken the
design and supervision of traditional underpinning schemes when
requested to do so and have provided detailed advice for schemes
to be designed by others.
Slope Stability, St Leonards, East Sussex
A large landslip occurred in the rear gardens of a row of terrace
of houses, constructed along the crest of a steep slope. The landslip
exposed the foundations and threatened the stability of the building.
A ground investigation was designed to enable the cause of the
slip and the stability of the properties to be assessed. The investigation
included the organisation of a topographical survey, the excavation
of exploratory holes and the installation of instrumentation for
long term monitoring. The report on the investigation included remediation
proposals, which were subsequently adopted by the supervising engineer
and the associated insurance companies. The proposals included the
construction of flexible earth retaining structures and improved
land drainage. Our engineers also provided construction supervision
and quality monitoring during the remediation contract.
|



|